The clash was caught at LOD 350. Before the coordination meeting. Before the RFI.
Bimvyne runs coordination analysis on your federated model overnight. Your team gets a prioritized clash report — LOD-aware, discipline-coded, severity-ranked — six hours before the meeting. You walk in to resolve conflicts, not find them.
Coordination intelligence, delivered before the meeting
Three capabilities that change when architecture firms see their coordination picture — from during the meeting to before it.
Automated Clash Analysis
AI reviews your federated model nightly, detecting clash intersections across all disciplines. Prioritized by severity and LOD — no manual Navisworks session required.
Pre-Meeting Report
PDF digest and dashboard clash matrix delivered 6 hours before your coordination meeting. Your team walks in with the clash list ready — not a blank screen.
RFI Prevention Tracking
Links each clash to its potential RFI origin. Tracks resolution status, assigns to discipline lead, and generates a change log for GC handoff.
From federated model to clash report in under 6 hours
Drop in your model — RVT, IFC, or NWD. Bimvyne processes it overnight and delivers the clash matrix before your next scheduled coordination meeting. No Navisworks session required.
MEP, structural, architectural — each discipline has different clash types
Bimvyne's analysis engine distinguishes discipline pairs, clash geometry, and LOD context. Not every conflict deserves the same severity score.
HVAC duct vs. structural beam. Caught before the call.
Mechanical conflicts with structural depth, sprinkler clearances, and electrical conduit routing — Bimvyne prioritizes MEP clashes by severity and discipline impact.
MEP coordination detailsBeam clashes are the hardest to resolve in the field.
Slab penetrations, embed plates, column conflicts — structural clashes at LOD 350 require precision detection before GC walkthrough, not after.
Structural coordination detailsYou're accountable for coordination quality. We give you the data.
Architecture firms manage MEP/structural subconsultants but own coordination quality. Bimvyne gives the lead architect visibility across all disciplines.
Architecture firm detailsEvery clash. Categorized by discipline. Sorted by severity. Ready 6 hours before the meeting.
Your BIM coordinator opens Bimvyne before the meeting and sees every active clash — LOD-aware, discipline-coded, and ready to assign.
Try It Free| Clash ID | Disciplines | LOD | Severity | Status |
|---|---|---|---|---|
| CLH-0042 | MEP-HVAC / STRUCT-STEEL | LOD 350 | High | ● Open |
| CLH-0041 | MEP-PLMB / ARCH-CEIL | LOD 300 | Medium | ● In Review |
| CLH-0038 | ARCH-CEIL / MEP-PLMB | LOD 300 | Medium | ✓ Resolved |
| CLH-0037 | STRUCT-BEAM / FOUND-SLAB | LOD 350 | High | ● Open |
| CLH-0035 | MEP-ELEC / MEP-MECH | LOD 200 | Low | ✓ Resolved |
| CLH-0034 | STRUCT-COL / MEP-HVAC | LOD 350 | High | ● Open |
Architecture firms that catch clashes early
We used to spend 2 hours in coordination meetings identifying clashes. Now we spend 20 minutes resolving them. Bimvyne delivers the clash list before anyone walks in the room.
On our last healthcare project, we had 12 MEP-structural clashes flagged at LOD 350 before the GC walkthrough. Every one of those would have been an RFI. That's a real cost number we didn't pay.
Stop finding clashes in the field.
Start catching them in the model.