Drone-to-BIM deviation detection

Your floor is 3 days behind.
The subcontractor hasn't told you yet.

Bimvyne runs a drone scan against your 4D BIM schedule nightly and surfaces deviations before the weekly meeting. Visual truth, not self-reported status.

Bimvyne — Project Alpha Tower · Scan 2025-04-22
Level 8
91%
Level 7
88%
Level 6
74%
Level 5
58%
Level 4
49%
Level 3
97%
67% of commercial projects finish behind the original CPM schedule
2 wks typical gap between when a delay is visible on-site and when the PM's look-ahead schedule reflects it

The weekly status call is the last place you find out.

Reality diverges Sub reports delay PM hears about it Action taken ~14 days of lost time

Bimvyne closes the gap at the source — before the sub files the report.

How It Works

How Bimvyne sees your site

Three steps from drone imagery to actionable deviation alerts — no manual data entry.

01

Drone captures site imagery

Weekly or daily drone flights over your site. Compatible with DJI, Skydio, and GoPro Karma hardware. No special equipment required — your existing workflow.

02

AI maps pixels to BIM elements

Photogrammetry point cloud is aligned to your IFC model coordinate space. Supports Revit IFC export, Navisworks NWF/NWD, and Tekla IFC.

03

PM gets deviation alerts by floor, by trade

Deviation alerts delivered to your dashboard and email. Each alert names the specific BIM element, floor, trade, and number of days behind schedule.

Dashboard Preview

What you see in the dashboard

Floor Progress Map
Level 12
94%
Level 11
89%
Level 10
71%
Level 9
53%
Level 8
44%
Level 7
100%
Level 6
100%
Deviation Alert Feed
Level 9 MEP rough-in 4 days behind schedule · Detected 2025-04-22
Level 8 concrete pour 5 days behind schedule · Detected 2025-04-22
Level 10 structural steel At risk: 2 days variance · Detected 2025-04-22
Level 11 formwork On schedule · Last verified 2025-04-22

No manual reporting. No waiting for Friday status calls.

Who It's For

Built for GC and owner teams

General Contractor

Update your 3-week look-ahead from imagery, not verbal reports

Walk into the OAC meeting knowing which subcontractor is behind and by how much — with scan data as the evidence, not a phone call from a superintendent. Push schedule accountability down to the trade level before rework sequencing compounds the delay.

3-day average lead time on delay detection vs. self-reported status
Owner / Developer

Cross-check draw requests against drone-detected completion

AIA payment applications report claimed completion percentages. Drone imagery shows what's actually in place. Bimvyne surfaces the delta between those two numbers before your bank inspection and disbursement decision.

24h drone scan to verified draw comparison — before the next disbursement
24h drone scan to PM alert
±2% floor area deviation threshold
4D BIM IFC + Navisworks schedule support
From Early Access Projects

What project teams are saying

We caught the concrete pour being 5 days behind on Level 6 two weeks before our superintendent flagged it. That changed our sequencing decisions on three trades above it.

Project Executive, mid-size commercial GC — Austin, TX

The gap between what the subcontractor says and what the drone actually shows is exactly what Bimvyne captures. For draw verification, that gap is worth real money.

Owner's Rep, mixed-use development project