Customers

Architecture firms that catch clashes before the call

BIM Coordinators and Project Architects at firms like these are the people Bimvyne is built for. The profiles below are representative composites of the types of projects and outcomes we're working toward.

Impact

What changes when clash data arrives before the meeting

Based on pilot feedback from early customers and coordination workflow observations. Numbers reflect directional outcomes, not audited performance claims.

~40% Fewer clash-related RFIs vs. prior project (directional, from pilot feedback)
45–60 min Shorter per coordination meeting when clash list is pre-delivered
<1 day From model upload to first prioritized clash report
LOD 200–500 Analysis calibrated to project stage — no false positives from schematic geometry
From the Field

From BIM Coordinators and Project Architects

What the coordination workflow looks like before and after getting clash data before the meeting — perspectives from the types of practitioners Bimvyne is designed for.

"We used to spend the first 45 minutes of every coordination meeting just finding the clashes. Now that work is done before anyone dials in. We're resolving issues instead of discovering them."

Daniel T.
BIM Manager, 35-person Architecture Firm (Commercial Mixed-Use)

"The LOD-awareness is what won us over. Other tools flagged everything. Bimvyne understands that a LOD 200 duct and a LOD 350 beam in the same zone is a soft conflict, not a hard stop. It learned our project."

Sarah K.
Project Architect, MEP-heavy Healthcare Facility Project

"Marcus walked us through the first report in under an hour. By the next coordination meeting, our team was using Bimvyne as the single source of truth for what needed to be resolved. No setup headache."

Rachel J.
Director of Technology, Mid-size AEC Firm

"Before Bimvyne, I'd get 200-clash reports from Navisworks and have to manually prioritize everything. Now I get the top 15 clashes that actually matter, with the context I need to address them in the next meeting."

Michael P.
Structural Engineer, Multi-Discipline Project Team
Who Uses Bimvyne

The coordination challenge Bimvyne is designed to solve

Architecture Firms (15–200 staff)

Managing coordination across multiple MEP and structural subconsultants. Responsible for clash documentation at GC handoff. 3–10 active projects of 50K–500K sqft.

AEC Integrated Firms

Architecture + engineering in-house. High volume of cross-discipline coordination. BIM department managing federated model quality across project types.

BIM Coordinators & Consultants

Third-party BIM managers working across multiple firms. Need a lightweight tool that works with any file format and doesn't require per-project software setups.

Join Early Customers

Start with your active project

Upload your current federated model. Marcus will walk you through the first clash report personally.